ع

Execution paths

Last reviewed:

Choose the assistance level from Options beside the message field. The path affects how the task runs and what it costs.

Which path should I choose?

  • Economy: the lowest-cost option for drafts, experiments, and simple changes.
  • Balanced: a balance of quality and cost for most projects.
  • Powerful: intended for larger, complex tasks, with a higher cost.

When do paths become available?

  • Without a paid top-up or an eligible plan, Economy is available.
  • After the first paid top-up, Balanced is also available. Free or granted credits alone do not count as a paid top-up.
  • With Pro or Enterprise, all three paths are available.
  • In a shared project, path access follows the owner’s account. The balance and account limits must still allow work even when a path is unlocked.

Choose before the task starts

  1. 1

    Open Options

    Click Options below the message field. Read the path description and any lock hint.

  2. 2

    Choose an available path

    Select a path. If locked, check Billing for the required top-up or plan, then return after the change is confirmed.

  3. 3

    Review the plan and start

    The path is fixed when a task starts. Topping up or changing plans later does not change a running task’s path. Check the selection for the next task, including a new phase of a large plan.

Additional options may appear when enabled, such as Auto execution or My account. Choose action automatically decides between building and discussion; Auto execution is a separate execution option.

A stronger path does not guarantee a complete result without review. Read the delivery notes and test the website.