Execution paths
Last reviewed:
Choose the assistance level from Options beside the message field. The path affects how the task runs and what it costs.
Which path should I choose?
- Economy: the lowest-cost option for drafts, experiments, and simple changes.
- Balanced: a balance of quality and cost for most projects.
- Powerful: intended for larger, complex tasks, with a higher cost.
When do paths become available?
- Without a paid top-up or an eligible plan, Economy is available.
- After the first paid top-up, Balanced is also available. Free or granted credits alone do not count as a paid top-up.
- With Pro or Enterprise, all three paths are available.
- In a shared project, path access follows the owner’s account. The balance and account limits must still allow work even when a path is unlocked.
Choose before the task starts
- 1
Open Options
Click Options below the message field. Read the path description and any lock hint.
- 2
Choose an available path
Select a path. If locked, check Billing for the required top-up or plan, then return after the change is confirmed.
- 3
Review the plan and start
The path is fixed when a task starts. Topping up or changing plans later does not change a running task’s path. Check the selection for the next task, including a new phase of a large plan.
Additional options may appear when enabled, such as Auto execution or My account. Choose action automatically decides between building and discussion; Auto execution is a separate execution option.
A stronger path does not guarantee a complete result without review. Read the delivery notes and test the website.